a, first understand customer information, based on the agent is not directly obtained from party a in the following information:
1) First understand what the project, in detail what to do, Public area or room) And obtain the tender documents, and the bidding qualifications.
2) Is solid, and local, volume size, the project progress status
3) From the bidding documents or with the customer to obtain what hour the hou to quotation, bidding and show what time delivery information.
above: hotel furniture customization project
two, get relevant technical materials from customer side, so that a more detailed understanding of products and offer.
4) Engineering decoration figure electronic files and company professional designers and engineering designers when necessary to stop the content of the detailed to do stop communicating.
5) Stop after having seen the electronic file and determine content to do the preparation of the quotation. ( Premise is to have time to bid)
6) Product data, cover data and the determination of its special materials, metal materials of positioning is to provide, or which provided by our designer request company involved in combing to offer product drawings.
7) To further determine the details of the products, color plate between example, hardware, such as cloth art tasks.
8) All business will not clear answer in the day of processing.
3, ready to deepen the drawings, the preparation before making sample
9) According to the bidding determine after good proofing detail, in determining the project quotation process allows designers read figure in order to deepen the drawings, buy time for proofing. And prepare all the tender drawings and related material.
10) Statistics show the required information as soon as possible, and please related department to business accounting dosage, please purchase early.
11) To deepen the understanding of customer information and the status of the competitors, the sample intercropping. At the same time, prepare the project listing details to prepare quotation. Details for further communication.
above: hotel furniture custom engineering
4, prepare all the engineering bid after the bid, sign a contract to prepare
12) Bid with party a immediately confirm the accuracy of content or to inspect the site designer. Solid products determine when the feet. Activity furniture detailed product confirm communication with party a designer for further details.
13) Discuss product information with customers, color plate, cloth, metal, product delivery time and other information.
14) Initial offer the drawings shall prevail.
5, the solid loading of all engineering drawings of the activity and further confirm that
15) Prepare all products deepen drawing tasks at the same time.
16) Solid loading local company designer living on-site deepening drawings directly communicate with each other designers or communicate with decorate a company to the node.
17) Drawing after completion, deepening feet and determine the details. Unilateral designer signature after unilateral and correct.
6, after sign the engineering contract supplement products, retroactive contract.
above: hotel furniture custom live-action
7, engineering single order, and push the first.
19) Products business consumption under the single
20) Order before the payment, Engineering down payment) Just open material consumption.
eight, after the completion of the product delivery order
21) Big project orders according to the area to determine the delivery order, communicate with customer before shipment delivery information. List of engineering equipment engineer worked out at the same time with party a docking matters
9 before the payment, delivery, just the delivery; Device team on-site installation guidance.
10 and device performance communication reaction processing at the scene.
11 archive, taking photos as a company to end device and the engineering cases. At the same time, prepare project acceptance of the end of matters.
12, in accordance with the contract agreed on at the beginning.
If you are sourcing for product development or manufacturing operations, you won't miss JiangSu TaoRong Furniture Co., Ltd. 's list of offer.
JiangSu TaoRong Furniture Co., Ltd. ’s mission is to provide high quality care and services to our members and to be profitable in the process.
TR is designed to enhance your savings in terms of cost, energy and efforts.If you are interested in our custom furniture custom made furniture products, please contact us soon.