Hotel furniture engineering related work process

by:TR     2020-11-09

guangdong hotel furniture engineering related work process

first understand customer information, to find the pr obtained from party a the following information:

1) First to understand what the project, what to do or whether ( Public area or room) , called

the file, and bidding qualification.

2) Part is solid, and activities, project size, project progress

3) From in the tender documents or get with the customer what hour the hou to quotation, bid and when to hand in between example

the information such as pay.

2, related technical information was obtained from the client, so that a more detailed understanding of products and offer. 4) Engineering company decoration figure electronic files and with necessary professional designers and engineering designers to specific

to communicate the content of

5) After seen within the electronic file and determine to do or whether the quotation of flat system. ( If have the opportunity to bright standard),

6) Product material, the cover material and it is the determination of orientation of metal material is or we provide, which provided by the applicant designers involved in combing to offer product drawings.

7) To further determine the details of the products, color plate between example, metal, cloth art, etc.

8) All business will not qing chu place consolidation settlements in answering questions.

3, to deepen the drawings, production sample before the case of

9) After good proofing detail set according to the tender document, in determining the project quotation process allows designers to read figure in order to deepen the drawings, buy time for proofing. And prepare all the tender drawings and related information.

10) Statistics show the required materials as soon as possible, and please use the related department to accounting, please purchase in advance.

11) Brother in-depth understanding of customer information and competition situation, the model intercropping. Into at the same time for the whole project of green single detail dimension for quotation. Detailed material requirements need to be further communication.

4, ready to overall project after the bid quotation, preparing to sign a contract

12) Bid immediately and party a's designer confirmation or whether indeed degrees or view the site. Solid products determine when the feet. Activities on specific furniture product designers to detail further confirm communication with party a

13) Discuss product information with customers, color plate, cloth, metal, the product delivery time information such as

14) Final offer will be subject to drawings

5, the overall engineering drawings of the activity and solid loading further confirm

15) Prepare all products at the same time deepening drawings work

16) Solid part company designer living on-site deepening drawings directly communicate with each other designers or communicate with decorate a company to the node.

17) Drawing after completion, deepening feet and determine the details. The two sides and correct after the designer signature.

6, after sign the engineering contract supplement products, retroactive contract. A single order, and push the first.

19) Production business under the single

20) Order before the payment, Engineering down payment) Just cutting production.

8, finished product delivery order

21) Big project orders according to the area to determine the delivery order, communicate with customer before shipment delivery information. List of engineering installation engineers worked out at the same time with party a docking matters

9, jue before shipment, your shipment; Send installation group on-site installation guide.

10, installation problems on-site communication feedback.

11 installation engineering case archive photos as a company. At the same time, prepare project completion acceptance.

12, according to contract agreement ends.

according to the above summary of guangdong hotel furniture engineering related work process, hope to be of help.


JiangSu TaoRong Furniture Co., Ltd. is one of the world’s leading and most-trusted suppliers to the relevant markets.
For more tips and strategies on effective custom made furniture solutions, get your choice at TaoRong Furniture.
give you an additional custom made furniture option for your custom made furniture, whether it being a custom made furniture, custom made furniture or custom made furniture. Go and get more info at TaoRong Furniture.
JiangSu TaoRong Furniture Co., Ltd. who primarily serve our consumers need to consider offering their products in an custom made furniture such as custom furniture to take advantage of the growing interest from consumers in supporting custom made furniture.
A quality monitoring group created for ensuring that JiangSu TaoRong Furniture Co., Ltd. manufactures custom furniture accoording the strictest standard.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...